One Comment Add yours

  1. CfR says:

    I am thankful that the powers that be had the foresight to not demolish the entire bridge, only the road deck – thus leaving the main structure to use at a later date, once funds become available. If a pedestrian/cycling deck were installed on top of that, there would be SO many options for connecting the two sides of the river. I believe Great Rivers Greenway has that bridge in their targets, but I don’t know when it’ll happen.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.